Prominent Hill Wira Shaft Australia, SA

Location
Prominent Hill, SA

Nearest Town
Coober Pedy, South Australia

Client
BHP

Commodity
Copper & Gold

Contract Type
KPI Adjusted Margin Alliance

Contract Duration
September 2021 - June 2024

Scope
Presink, raisebore, strip and concrete line haulage shaft at a 7.5m diameter to a depth of 1,330m below surface.

Byrnecut has been involved at BHP’s Prominent Hill underground mine since cutting the portal in 2010.

Byrnecut has completed in excess of 80 kilometres of development and produced over 20 million tonnes of copper-gold ore. The project successfully transitioned to an Alliance style contract in 2020.

Byrnecut undertake all underground activities at Prominent Hill including development, longhole drilling and charging, paste fill, stope bogging and fibrecrete batching & application.

The Wira Haulage Shaft is designed to handle 6Mtpa from 1290m below surface.

Byrnecut are successfully introduced the Herrenknecht VSM shaft sinking system to Australia at Prominent Hill. This mechanised, non-entry system excavated the shaft pre-sink to a depth of 93m.

Following the pre-sink, a pilot hole was constructed from surface to mid-shaft, then another from mid-shaft to shaft bottom. The full 7.5m diameter shaft is constructed using a strip and line methodology.

Prominent Hill is located in the remote arid northern Woomera region of South Australia. Byrnecut operate the mine 365 days per year, 24 hours per day on a fly-in, fly-out basis from Adelaide.

Byrnecut-prominent-hill-Map

Carrapateena 
Australia, SA

0
employees
0m
shaft diameter
0m
shaft depth
0
duration
Presink Herrenknecht VSM-00012
Raise Drill Robbins 123RHc
Stage Winders 4 x 55kW Timberland Electric Winders
Kibble Winder 1200kW Double Drum
Sinking Stage 5 Deck purpose designed Sinking Stage

Cadia East

Australia, NSW

2010 – 2013

completed

Sinclair

Australia, WA

2010 – 2013

completed

Merlin

Australia, QLD

2010 – 2013

completed

Mariners

Australia, WA

2009 – 2011

completed

Ballarat Gold

Australia, VIC

2008 – 2009

completed

Golden Grove

Australia, WA

2008

completed

Frasers Decline

New Zealand, South Island

2006 – 2010

completed

Havieron

Australia, WA

2021 – 2024

active

Telfer

Australia, WA

2005 – Evergreen (LOM)

active

Greenbushes

Australia, WA

2005 – 2007

completed

Ridgeway Deeps

Australia, NSW

2005 – 2006

completed

Tritton

Australia, NSW

2004 – 2008

completed

Nifty

Australia, WA

2004 – 2007

completed

Agnew

Australia, WA

2002 – 2010

completed

Mt Gordon

Australia, QLD

2002 – 2009

completed

Jundee

Australia, WA

2001 – 2024

active

Cosmos

Australia, WA

2001 – 2012

completed

Mt Marion

Australia, WA

2001 – 2007

completed

Hill 50 and Morning Star

Australia, WA

1999 – 2007

completed