Golden Grove Australia, WA

Location
250km East of Geraldton, WA

Nearest Town
Geraldton, WA

Client
29 Metals

Commodity
Copper & Zinc

Contract Type
Fixed & Variable Schedule of Rates

Contract Duration
October 2022 to September 2027

Scope
Facilitate smooth transition in ownership, declining, lateral and vertical development and stope production using longhole methods.

Byrnecut has been engaged by EMR to assist the EMR management team with the transition of ownership in March 2017.

Ownership of the Golden Grove Mine changed hands from MMG to EMR in March 2017. Byrnecut was engaged to assist the EMR management team to transition from an owner-operator mine to a Contractor model. Byrnecut took over the majority of the workforce and equipment fleet, and has steadily upgraded plant items and implemented new technology under an extensive fleet replacement programme.

The project lies 56km south of the township of Yalgoo, 600km north of Perth WA. The Scuddles and Gossan Hill mines produce zinc and copper concentrate from the treatment plant located at Scuddles mine site. Scuddles ore undergoes primary crushing underground before being hoisted to the surface for processing

Gossan Hill ore is trucked to the surface and crushed at the Gossan Hill ROM pad before being transported approximately 3km overland by conveyor to the treatment plant at Scuddles. Development ground support and rehab activities are extensive at the project.

Sub-level stoping is the primary method used in both mines. This method at times is combined with fill varieties including waste rock fill, cemented rock fill and paste fill.

Golden Grove is accessed by sealed roads from Perth, with personnel flying directly to site on a FIFO basis.

0
employees
0
pieces of equipment
0m
Adv. / Month (2022)
0t
Ore / Month (2022)
map of lower part western australia

Golden Grove - EMR
Australia, WA

Development Drills Sandvik DD421
Sandvik DD422i
1
4
Production Drills Sandvik DL421-15C
Sandvik DL432i
3
1
Cable Bolter Sandvik DS422i-C 1
Boggers Sandvik LH621
Caterpillar R2900
4
4
Trucks Atlas Copco MT65 13
Charge-up Units Normet 1614B Emulsion Unit
Orica MCU
1
1

Prominent Hill Wira Shaft

Australia, SA

2021 – 2024

active

Carrapateena

Australia, SA

2021 – 2026

active

Abra

Australia, WA

2021 – 2025

active

Wiluna

Australia, WA

2020 – 2024

completed

Hamlet

Australia, WA

2021 – 2023

active

Paddington Gold

Australia, WA

2020 – 2023

active

Cadia – PC2-3

Australia, NSW

2020 – 2022

completed

Thunderbox

Australia, WA

2018 – 2024

active

Invincible

Australia, WA

2017 – 2023

active

Capricorn Copper

Australia, QLD

2023 – 2028

active

Carosue Dam

Australia, WA

2017 – 2024

active

DeGrussa – Monty

Australia, WA

2017 – 2022

completed

Challenger #1

Australia, SA

2017 – 2018

completed

Water Tank Hill

Australia, WA

2016 – 2023

active

DeGrussa

Australia, WA

2014 – 2020

active

Challenger #2

Australia, SA

2013 – 2015

completed

Cave Rocks

Australia, WA

2013 – 2014

completed

Gwalia Deeps

Australia, WA

2012 – 2021

completed

George Fisher

Australia, QLD

2012 – 2014

completed

Prominent Hill

Australia, SA

2010 – 2025

active

Athena Mine Site

Australia, WA

2010 – 2019

completed

King of the Hills

Australia, WA

2010 – 2015

completed

Ernest Henry

Australia, QLD

2010 – 2014

completed

Cadia East

Australia, NSW

2010 – 2013

completed

Sinclair

Australia, WA

2010 – 2013

completed